Equipment details | CFA2-22E(S)-T-H-1-1N BEER KEG WASHER AND FILLER | CFA2-33E(S)-T-H-1-1N BEER KEG WASHER AND FILLER |
|
1 | Size:W*L*H | 1.50X1.51X2.15M | 1.60X1.60X2.15M |
2 | Weight | 246KG | 286KG |
3 | with slide or not | No | Yes | No | Yes |
4 | 外包裝尺寸Packing Size (L*W*H) | 1.70X1.65X2.29M | 1.85X1.75X2.5M |
5 | Gross Weight | 425KG | 465KG |
6 | Capacity | Washing part: | 15-20pcs/h | Filling part: | 40-50pcs/h | Washing part: | 15-20pcs/h | Filling part: | 40-50pcs/h |
7 | Power | According to user local power (3 Phases 380V 50Hz) | According to user local power (3 Phases 380V 50Hz) |
8 | Power port | 3P+N+G | 3P+N+G |
9 | Heater way | Steam Coiler | Electrical Heater | Steam Coiler | Electrical Heater |
10 | Power consumption | 2.0KW | 14.0KW | 3.0KW | 15.0KW |
11 | Main Material | SUS304 | SUS304 |
12 | Water tank material and volume | SUS304 Single tank / Volume=100L (2pcs) | SUS304 Single tank / Volume=100L (3pcs) |
13 | Motor type and brand | SUS304 Pump Head | SUS304 Pump Head |
14 | Temperature prode | NTC | NTC |
15 | Temperature control mode | STC-200 | STC-200 |
16 | Time setting way | Siemens PLC 200 smart | Siemens PLC 200 smart |
17 | Connect type | water inlet and drain outlet | 1.5" Tri-clamp | Steam inlet | DIN male fitting | 1.5" Tri-clamp |
| DIN male fitting |
|
18 | Spear type | A | S | D | G | A | S | D | G |
19 | Keg type | EURO DIN AMERICAN 20L-60Lkeg | EURO DIN AMERICAN 20L-60Lkeg |
20 | Filling measurement type | Flow Switch |
| Flow Meter |
| Flow Switch |
| Flow Meter |
|
21 | Washing part inlet with pressure detection or not | Yes |
| No |
| Yes |
| No |
|
22 | Washing part outlet with the residual liquid detection or not | Yes |
| No |
| Yes |
| No |
|
23 | Washing working procedure | Lock down → air purge/drain off → hot water washing→ air purge/drain off → caustic washing → air purge/to caustic tank → hot water 1 washing → air purge/drain off → hot water 2 washing →steam drain hot water→steam sterilized → steam keep pressure sterilized→CO2 purge/drain off→CO2 fill
Lock down → air purge/drain off → hot water washing→ air purge/drain off → caustic washing → air purge/to caustic tank → hot water 1 washing → air purge/drain off → hot water 2 washing → air purge/drain off →sanitizer sterilize →CO2 purge/to sanitizer tank→CO2 fill | Lock down→ air purge/drain off → hot water 1 washing→ air purge/drain off → caustic washing → air purge/to caustic tank → hot water 2 washing → air purge/drain off →acid washing → air purge/to acid tank→hot water 3 washing →steam purge/drain off →steam sterilized → steam keep pressure sterilized→CO2 purge/drain off→CO2 fill |
24 | Filling working procedure | Lock down → Sterilize → CO2 purge/drain off →open spear → CO2 fill → fill → close spear → hot water rinse → CO2 purge/drain off | Lock down → Sterilize → CO2 purge/drain off →open spear → CO2 fill → fill → close spear → hot water rinse → CO2 purge/drain off |
25 | Package | Composite board boxes | Composite board boxes |
26 | Lead time | 40-45 days | 40-45 days |